|
|
By utilizing wieight factors, users are able to prioritize machines for assignment. This feature is useful when there are several candidates of machines for a single product/ step. Evaluation is performed based on results of several temporary assignment (back tracking), which brings about accurate solution. |
![]() |
|
PlanWizard generates schedules in both backward or forward direction or in combined directions. In the backward scheduling , orders are assigned just before their due dates. This type of schedule reduces inventory. However it is inconvenient in this case that operations do not start at the beginning of morning shift. Bi-directional scheduling feature of PW solves this problem. In addition, this function solves past assignment problem caused by backward scheduling. This feature is very convenient for practical scheduling purposes. |
![]() |
![]() |
| White | Yellow | Green | Black | |
| White | 00:00 | 01:00 | 02:00 | 03:00 |
| Yellow | 02:00 | 00:00 | 01:00 | 02:00 |
| Green | 04:00 | 02:00 | 00:00 | 01:00 |
| Black | 06:00 | 04:00 | 02:00 | 00:00 |
| Large | Small | |
| Large | 00:00 | 00:30 |
| Small | 00:30 | 00:00 |
| Circle | Triangle | Square | |
| Circle | 00:00 | 01:00 | 02:00 |
| Triangle | 01:00 | 00:00 | 01:00 |
| Square | 02:00 | 01:00 | 00:00 |
| When there are limits to the minimum as well as maximum loading amount to facilities such as vessels or storage tanks, PlanWizard is able to automatically select available facilities and assigns orders to right facilities. |
.
All the orders are assigned to proper tankas. The selection and assignment are automatically carried out based on initial settings. |
Some of the orders are overloaded. Order amount and tank capacity are note taken into consideration. |
| Wizard System Laboratory Co,.Ltd
E-mail: info@wizard-system.com |
Copyright (C) Wizard System Laboratory Co,.Ltd All Rights Reserved. |



.